Our Turbines
-
Method Soap, Chicago IL
Located in Chicago’s historic Pullman neighborhood, this 600kw turbine was installed in 2014 and has continued to provide Method’s plant with clean energy ever since. This recycled turbine contributed to the plant’s designation as the first LEED-certified manufacturing plant in the United States.
-
ALDI, Dwight IL
This 600 kw turbine was installed at an ALDI distribution center in Dwight, IL in 2020. The distribution center is Dwight’s largest employer, and the turbine produced over 700,000kWh of energy in 2023 alone.